Alan - Rigger - L1

Specialist: Sky91

Bekijk of deze specialist geschikt is voor uw werkzaamheden. Is de specialist geschikt of wilt u meer informatie? Neem dan contact op met ons en wij helpen u graag verder.

Ervaringen

03.2020-04.2020: Offshore Platform UK
  • RA rigger
  • PA duties for Global Resources Maintenance Team
  • Various repair workscopes throughout the CAP&CPP
02.2020 - 03.2020 : Offshore Platform UK
  • RA rigger
  • Upgrade Workscope
  • Assisting with platform turbine upgrade
11.2018 - 12.2019: Onshore Project UK
  • Rigger
  • Shutdown/ Turnaround of industrial object
  • Removal/ reinstallation of machinery and components
  • Slinging loads and banking 250 tonne mobile crane
  • Safe use of all lifting equiptment and accessories
09.2019- 11.2019: Offshore Energy Platform UK
  • RA rigger
  • Major overhaul of gas turbine
  • Installation of lifting beam
  • Pre rigging for various lifts, removal of pipework
08.2019r. - 09.2019 r.: Offshore Platform UK
  • RA rigger
  • Installation of structural supports on pipe deck walkway
  • Installation of temporary chocks on risers
  • Outboard RA workscopes
07.2019r. - 08.2019 r.: Offshore Oil&Gas Platform in North Sea
  • RA rigger
  • Rigging operations during FPS Outage
  • Removal/ reinstallation of various valves / PSVs
  • Safe use of lifting equipment
06.2019r. - 07.2019 r.: Offshore Platform UK
  • RA rigger
  • Installation of Smart Shims onf platform risers
  • Outboard RA rigging workscope
05.2019 - 06.2019: Offshore Oil&Gas Platform UK
  • RA rigger
  • Removal of all obstructing steel/ pipework from platform legs
  • Outboard RA rigging workscope
02.2019 - 04.2019: Offshore Wind Farm UK
  • Offshore Wind Farm Rigger
  • Installation of cables, cable pull ins from vessel to wind turbine towers and OSS
  • Pre/ De rig of wind turbine towers, Cable Stripping, Hang off installs
09.2018-12.2018: Mariner Platform UK
  • RA rigger
  • RA rigging work on construction phase
  • Assist Aker Solutions with rigging work at height
  • Removal of 20 tonne sections of transport steel work
10.2018-10.2018: Offshore Oil&Gas Platform UK
  • RA rigger
  • RA rigging workscope on platform crane
08.2018- 09.2018: Offshore Wind Farm Germany
  • Rigger
  • Installation of Subsea array cables into wind turbine towers and offshore substation platforms
07.2018-08.2018: Offshore Wind Farm UK
  • Rigger
  • Installation of Subsea array cables into wind turbine towers and offshore substation platform
  • Pre/ de rig of wind turbine towers, Cable Stripping, Hang off installs
07.2018-07.2018: Offshore Wind Farm Germany
  • Beach Export Cable Pull
  • Mob up all barges&pontoons ahead of export cable pull
  • Preparation of all rigging and lifting equiptment and accessories
06.2018-07.2018: Offshore Oil&Gas Platform UK
  • RA rigger
  • Outboard RA workscope removing 12 metre weather damaged scaffold tower
05.2018-06.2018: Offshore Oil&Gas Platform UK
  • RA rigger
  • Installation of all rigging equiptment ahead of platform shutdown
  • Assist Enermech removal and reinstallation of various valves and pipe spools
04.2018-05.2018: Offshore Oil&Gas Platform
  • Satellite rig Decommissioning Project
  • Removal of underdeck scaffolding and loose objects ahead of topside removal from jacket
  • DROPS Surveys
  • Outboard RA workscope
07.2017-03.2018: Oil Rafinery UK
  • Rigger
  • Various rigging and heavy lifting operation with use of cranes upto 500 tonnes
05.2018-07.2018: Offshore Oil&Gas Platform UK
  • RA rigger
  • RA rigging workscopes as part of platform shutdown
  • Removal/ re installation of DBR Pipe work, valves and spools
03.2017-05.2017: Offshore Platform UK
  • RA rigger
  • Destruct of existing crane ganrty platforms
  • Modification of installation of new platforms on CAP Crane
  • RA rigging work at height of 50+ metres
10.2016-03.2017: Offshore Oil&Gas Platform UK
  • RA rigger
  • RA rigging workscopes during construction and commissioning of platform
05.2016-10.2016: Offshore Oil&Gas Platform UK
  • RA rigger
  • Outboard RA rigging project-removing 11 x 14 tonne Barge Bumpers from various locations on platform jacket
04.2016-05.2016: Offshore Platform UK
  • Rigger
  • Installation of supporting steelwork for new bridge
  • Destruct and removal of 36 inch tube bundles
  • General rigging and lifting operations in accordance to platform requirements
03.2016-04.2016: Offshore Oil&Gas Platform UK
  • RA rigger - decommissioning Project
  • Removal of Cassion and other obstructions from platform legs ahaed of final decommissioning lift
12.2015-02.2016: Schipbuilding company UK
  • Rigging and lifting operations
  • Ship refits and overhauls
  • Rigging on all parts of ships incl. propellor and shaft, removal reinstallation, removal of rudders, pipework, valves etc.
09.2015-10.2015: Offshore Oil&Gas Platform UK
  • Rigger
  • Assisting platform with rigging and lifting operations as part of scheduled platform shutdown
  • Removal / re installation on valves pipe spools etc/
07.2015-09.2015: Offshore Oil&Gas Platform UK
  • Rigger
  • Pre rigging of lifting equipment prior to platform shutdown, removal/ replacement of valves and pipework, safe use of all lifting equipment and accessories
03.2015-07.2015: Offshore Oil&Gas Platform NL
  • Pipeline replacement project
  • Removal/ Replacement of 4,5 km of 36 inch crude oil import pipeline from offshore pipeline and PLEM to beach
  • Assist in installation of steel piles and rollers for pipe pulling operations
  • Mob/ demob all barges and pontoons with various loads of equipment for project
  • Destruct existing pipeling
  • Construction of artificial Island
03.2015-07.2015: Offshore Platform UK
  • Construction of flight deck and accommodation platforms
11.2014-01.2015: Offshore Platform UK
  • Construction of flight deck and accommodation platforms
07.2014-11.2014: Offshore Wind Farm UK
  • Foreman Tower Team during Wind Farm construction
  • In charge of subsea array cable pullins from vessel deck into wind turbine towers and offshore substation platform
  • Tekmar CPS installations and activations,
12.2013-07.2014: Offshore Wind Farm UK
  • Rigger
  • Part of tower teams installing subsea array cables into wind turbine towers and offshore sustations
  • Messenger wire installations
  • Pre and derig of all towers
  • Mini ROV surveys
  • Hang off clam installation
06.2013-12.2013: Offshore Wind Farm UK
  • Rigger on Offshore Wind Farm construction
  • 1st and 2nd end cable pull ins
  • Deck operations assisting divers with subsea workscopes
  • Concrete Materess Laying
  • Installation of cable quadrants on offshore substations

Certificaten

  • IRATA certificate L1
  • NVQ Level 3 Rigger
  • OPITO Stage 4 Rigger
  • OPITO MIST
  • OPITO FOET
  • FULL GWO
  • UGUK Medical
  • CCNSG Safety Passport
  • Yellow Fever Vaccination

Talen

  • English

Bent u geïnteresseerd in deze professional?

Neem dan contact met ons op via: +31 (0) 183 73 3100 of info@sky-people.nl

Stel uw vraag